1) Mobilization,Site cleaning,Layout and Pile works. .
2) Earth excavation and Backfilling Sides of Excavation.
3) Sand filling inside plinth,single layer polythene sheet, Single layer brick flat soling and Mass concrete works .
4) Reinforced cement concrete works of Pile cap or Footing,UGWRT and ST.
5) Reinforced cement concrete works of Pedestal, column capital and Share wall.
6) Reinforced cement concrete works of Beam,Slab,Stair and Ramp.
7) Reinforced cement concrete works of Lintel and Sunshade.
8) Revision of previous classes.
9) Formwork works of Pile cap or Footing,UGWRT, ST, Column,Share wall,Beab,Slab,Stair,Ramp,Lintel and Sunshade.
10) Bar Bending Schedule for Plile.
11) Bar Bending Schedule for Pile cap or Footing,UGWRT and ST.
12) Bar Bending Schedule for Pedestal, column capital and Share wall.
13) Bar Bending Schedule for Beam,Slab,Stair and Ramp.
14) Bar Bending Schedule for Lintel and Sunshade.
15) Brick Works.
16) Plaster Works.
17) Patent stone Works.
18) Paint Works.
19) Tiles Works.
20) Door and Window Works.
21) Arboriculture Works.
22) Prepare MOQ(Materials of Quantity).
23) Sanitary and Pluumbing Works.
24) Electromechanical Works.
25) Introduce and Discussion on PWD Rate Schedule.
26) Prepare BOQ(Bill of Quantity).
Curriculum
- 21 Sections
- 21 Lessons
- 50 Weeks
- Day 11 Item
- Day 21 Item
- Day 31 Item
- Day 41 Item
- Day 51 Item
- Day 61 Item
- Day 71 Item
- Day 81 Item
- Day 91 Item
- Day 101 Item
- Day 111 Item
- Day 121 Item
- Day 131 Item
- Day 141 Item
- Day 151 Item
- Day 161 Item
- Day 171 Item
- Day 181 Item
- Day 191 Item
- Day 201 Item
- Day 211 Item
Requirements
- Diploma/BSc in Civil Engineering

interested
আমি এগুলো নিতে চাই এবং শিখতে চাই