1) Mobilization,Site cleaning,Layout and Pile works. .
2) Earth excavation and Backfilling Sides of Excavation.
3) Sand filling inside plinth,single layer polythene sheet, Single layer brick flat soling and Mass concrete works .
4) Reinforced cement concrete works of Pile cap or Footing,UGWRT and ST.
5) Reinforced cement concrete works of Pedestal, column capital and Share wall.
6) Reinforced cement concrete works of Beam,Slab,Stair and Ramp.
7) Reinforced cement concrete works of Lintel and Sunshade.
8) Revision of previous classes.
9) Formwork works of Pile cap or Footing,UGWRT, ST, Column,Share wall,Beab,Slab,Stair,Ramp,Lintel and Sunshade.
10) Bar Bending Schedule for Plile.
11) Bar Bending Schedule for Pile cap or Footing,UGWRT and ST.
12) Bar Bending Schedule for Pedestal, column capital and Share wall.
13) Bar Bending Schedule for Beam,Slab,Stair and Ramp.
14) Bar Bending Schedule for Lintel and Sunshade.
15) Brick Works.
16) Plaster Works.
17) Patent stone Works.
18) Paint Works.
19) Tiles Works.
20) Door and Window Works.
21) Arboriculture Works.
22) Prepare MOQ(Materials of Quantity).
23) Sanitary and Pluumbing Works.
24) Electromechanical Works.
25) Introduce and Discussion on PWD Rate Schedule.
26) Prepare BOQ(Bill of Quantity).
Curriculum
- 15 Sections
- 15 Lessons
- 50 Weeks
- Day 11 Item
- Day 21 Item
- Day 31 Item
- Day 41 Item
- Day 51 Item
- Class 61 Item
- Day 71 Item
- Class 81 Item
- Class 91 Item
- Class 101 Item
- Class 111 Item
- Class 121 Item
- Class 131 Item
- Class 141 Item
- Class 151 Item
Requirements
- Diploma/BSc in Civil Engineering